CSC 217 Lab 08 - LinkedAbstractList
The next step in implementing PackScheduler
is to add functionality for students to register for classes they want to take by adding students to a course roll. You’ll create a utility class that will have a custom implementation of a generic LinkedAbstractList
that doesn’t allow null elements or duplicates. Additionally, the list will have an enrollment capacity. From there, you will create a CourseRoll
and incorporate it into the Course
class. There will be some additional modifications to Schedule
, Student
, and EnrollmentManager
to create the end-to-end implementation.
Learning Outcomes
- Create a custom
LinkedAbstractList
implementation that extendsAbstractList
. - Integrate the custom
LinkedAbstractList
into a larger implementation.
Lab Checks
There are several checks that will occur during your build to ensure that you’re following software engineering best practices:
- Library checks: You’ll be working with the
SortedList
class that is part of the CSC217Collections library. Additionally, you’re creating a customArrayList
andLinkedAbstractList
implementation. You must remove all of your references tojava.util.ArrayList
andjava.util.LinkedList
from your project - including the Javadoc. If you receive a red ball and a message in the console output about usingjava.util.ArrayList
orjava.util.LinkedList
, search your project for the string and regenerate your Javadoc! - Coverage checks: You must have 80% coverage for each non-GUI and non-test class in
PackScheduler
. A tool will check that you have passed the 80% threshold before running any of the teaching tests.
Lab Deadlines & Jenkins Servers
All labs are due 10 minutes before the start of the next lab. Additionally, each lab section has their own dedicated lab Jenkins server. The table below provides the deadline and server URL for each lab section for the current semester.
Lab Section | Deadline | Jenkins Server Link |
---|---|---|
Section 201 | 3/28/2022 10:30am | https://csc217-201-jenk.csc.ncsu.edu/jenkins/ |
Section 202 | 3/28/2022 12:40pm | https://csc217-202-jenk.csc.ncsu.edu/jenkins/ |
Section 203 | 3/28/2022 2:50pm | https://csc217-203-jenk.csc.ncsu.edu/jenkins/ |
Section 204 | 3/28/2022 5:10pm | https://csc217-204-jenk.csc.ncsu.edu/jenkins/ |
Section 211 | 3/29/2022 8:20am | https://csc217-211-jenk.csc.ncsu.edu/jenkins/ |
Section 213 | 3/29/2022 2:50pm | https://csc217-213-jenk.csc.ncsu.edu/jenkins/ |
Section 214 | 3/29/2022 5:10pm | https://csc217-214-jenk.csc.ncsu.edu/jenkins/ |
Section 222 | 3/30/2022 12:40pm | https://csc217-222-jenk.csc.ncsu.edu/jenkins/ |
Section 223 | 3/30/2022 2:50pm | https://csc217-223-jenk.csc.ncsu.edu/jenkins/ |
Section 231 | 3/29/2022 11:45pm | https://csc217-231-jenk.csc.ncsu.edu/jenkins/ |
Section 601 | 3/29/2022 11:45pm | https://csc217-601-jenk.csc.ncsu.edu/jenkins/ |
Lab Rubric
You will be evaluated out of 70 points in the Technical Rubric. Synchronous students will also be evaluated on their teaming: a combination of In-Lab Participation and Out-Lab Participation. Collaborating Asynchronous students will also be evaluated on their participation in their pair.
Pair/teams are expected to work together on all aspects of the lab activity. Points may be deducted for not contributing or for not providing a partner the opportunity to contribute. The teaching staff strongly encourages working synchronously and requires that these collaborative sessions are documented in GitHub commit messages for the teaching staff to note the team contribution.
Technical Rubric
Phase | Grade Item | Points | Details |
---|---|---|---|
Teaching Staff Unit Tests | 15 | Pass all of the teaching staff unit tests (no regressions), both provided and hidden. | |
Student Unit Tests | 15 | Pass all of your unit tests. | |
Student Test Coverage | 15 | 80% statement/line coverage on every non-UI/non-test class. | |
Teaching Staff System Tests | 10 | Pass all of the teaching staff system tests (note that they will not be provided). | |
Javadoc Comments | 5 | All classes, including the tests are commented with meaningful comments. | |
Javadoc Generation | 5 | Javadoc tool was used to generate the HTML version of the API, which matches the current version of the in-code Javadoc. | |
Style | 5 | Any PMD, CheckStyle, or SpotBugs Scary or Scariest notifications will result in a one point deduction, up to the available points. | |
Total Points | 70 |
Synchronous Collaboration Rubric
Grade Item | Points | Details |
---|---|---|
In-Lab Collaboration | 10 | PTFs will be looking for collaboration with your partner during lab activities. Did you participate in completing the lab assignment? Did you balance your roles of driver and navigator? There will be deductions for observations of non-participation or hogging of one role or the other so a partner cannot participate. |
Out-Lab Collaboration | 10 | Did you make at least one meaningful commit to GitHub for completing the lab (e.g., meaningful means that the commit has to contribute to the solution and isn't superficial)? If you pair programmed, is it noted in the commit message? Did you not allow your partner, who wanted to contribute, to commit? |
Tasks | 5 | Did you add your tasks for the lab to the top of the README file? Did you include owners? Did you include internal deadlines? Are the tasks shown as complete with any other needed updates (e.g., the person who completed or helped with the task changed) |
Collaboration Check-in | 5 | Did you complete the collaboration check-in on time? |
Asynchronous Collaboration Rubric
Grade Item | Points | Details |
---|---|---|
Collaboration | 10 | Did you make at least one meaningful commit to GitHub for completing the lab (e.g., meaningful means that the commit has to contribute to the solution and isn't superficial)? If you pair programmed, is it noted in the commit message? Did you not allow your partner, who wanted to contribute, to commit? |
Tasks | 5 | Did you add your tasks for the lab to the top of the README file? Did you include owners? Did you include internal deadlines? Are the tasks shown as complete with any other needed updates (e.g., the person who completed or helped with the task changed) |
Collaboration Check-in | 5 | Did you complete the collaboration check-in on time? |
Deductions
Grade Item | Points | Details |
---|---|---|
Misnamed file or incorrect project structure | -5 | Incorrect names of files or incorrect project structure. This can include problems when importing the project to Eclipse for acceptance testing, incorrect location of the system test file, incorrect file extension, etc. |
Other deductions | -5 | If the project has to be manually graded due, you will receive a 5 point deduction. Make sure that your project builds on Jenkins! |